![]() ![]() Please view our current IFS here: Infrastructure Funding Statement and Developer contributions | Arun District Council Our first IFS was published in September 2020 to cover the period from April 2019 to 31 st March 2020. The aim of this statement is to provide an update on all matters regarding developer contributions (Section 106 (S.106) and Community Infrastructure Levy (CIL)) during the previous financial year. Progress of Infrastructure provision within the Strategic Site or in Arun as a whole can be found in the Infrastructure Funding Statement (IFS) The strategic allocation requires the design and layout of the allocation to integrate Fontwell with the existing urban area at Wandleys Close. ![]() The Arun Local Plan 2011-2031 identifies the Fontwell strategic allocation, under policy H SP2c (SD6), as providing at least 400 dwellings over the plan period. The Arun Local Plan 2011-2031 identifies a number of ‘Strategic Allocations’ which are areas of land (sites) that have been identified to provide residential and commercial development to meet local housing and employment needs throughout the plan period (2011-2031). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |